
GIVE THE PERFECT GIFT
Erin Mills Town Centre Gift Cards are the perfect choice for your gift giving needs.Purchase gift cards at kiosks near the food court or centre court, at Guest Services, or click below to purchase online.PURCHASE HEREHome
An Analysis of Construction Contractor Performance Evaluation System
Indigo
Loading Inventory...
An Analysis of Construction Contractor Performance Evaluation System
Current price: $59.00


An Analysis of Construction Contractor Performance Evaluation System
Current price: $59.00
Loading Inventory...
Size: Paperback
*Product information may vary - to confirm product availability, pricing, shipping and return information please contact Indigo
A rigorous system for rating construction contractor performance does not exist for the USAF as identified by the Air Force Civil Engineer (USAF CE), Major General Del Eulberg (Eulberg, 2007). The United States Army Corp of Engineers (USACE) uses DD Form 2626 for contractor performance evaluation and contractor selection. The objective of this research is to strengthen the USAF contractor rating system by exploring USACE's use of DD Form 2626. Using data from DD Form 2626, statistical analysis was conducted to determine if the measured performance sub-items reflect their respective performance elements, if the resulting performance elements relate to the overall contractor performance rating, and finally, if a relationship exists between the overall contractor performance rating and the overall project schedule performance.
A rigorous system for rating construction contractor performance does not exist for the USAF as identified by the Air Force Civil Engineer (USAF CE), Major General Del Eulberg (Eulberg, 2007). The United States Army Corp of Engineers (USACE) uses DD Form 2626 for contractor performance evaluation and contractor selection. The objective of this research is to strengthen the USAF contractor rating system by exploring USACE's use of DD Form 2626. Using data from DD Form 2626, statistical analysis was conducted to determine if the measured performance sub-items reflect their respective performance elements, if the resulting performance elements relate to the overall contractor performance rating, and finally, if a relationship exists between the overall contractor performance rating and the overall project schedule performance.


















